Hamriyah CCGT Power Plant
Sumitomo Corporation, GE EFS, Shikoku and Sharjah Asset Management
2019
USD 900 MM
Ensuring the supply of demand in peak events and reducing the carbon footprint vs other alternatives
- Power output: 1,800 MW
- Combined Cycle Power Plant on 3 x (1+1) configuration
- Fuel: Natural Gas
- Gas Turbine supplier/model: General Electric/9H.01
- HRSG supplier: General Electric
- Steam turbine supplier/model: General Electric/D652
- Cooling system: direct sea water cooling
EPC Lump Sum. The scope of TR includes the complete balance of plant beyond the supply (as consortium partner) of GE of the power island equipment, and the complete construction of the plant.